Centre for Contemporary Art, Nottingham (CCAN), High Pavement, Nottingham, NG1 2GB

Capital Floors were responsible for the installation of all the Hardwood flooring at Nottingham Contemporary following its construction in March 2009.

The Rustic Oak Plank boards were supplied by Reflex Sports Ltd and fitted throughout the building totalling nearly 1800m².

In the intervening years Capital Floors Maintenance has been in regular contact with the Facilities Management Team at CCAN carrying out regular inspections and maintenance as and when required.

In January 2020 Capital Floors undertook the refurbishment of the combined Reception / Shop / Lobby and all four Galleries. Working within strict time constraints, the floors were sanded back to the bare wood. Our maintenance team passed over the floors 3 times with specialized sanding equipment, to achieve the desired level of fine finish, before applying Bona Prime base coat, de-nibbing and applying the final coats of Bona Traffic HD lacquer. The vast majority of stains, scratches and gouges are removed by the process. The floors have been returned to as near to their original condition as is possible.

Capital Floors Maintenance have provided recommendations for cleaning products and the day to day care of the floors. We will provide ongoing support by contacting CCAN annually to arrange inspections with a view to carrying out Deep Cleaning & Sealing, repairs etc. in the future.